Projet

Général

Profil

Key Words and Abstract » Historique » Version 1

Anonyme, 31/03/2021 10:41

1 1 Anonyme
h1. Key Words and Abstract
2
3
*Key Words :*
4
Electronic circuit simulator, siren, inrush current, start threshold, transmission line
5
6
*Abstract :*
7
The company EATON COOPER based in Riom is specialized in fire safety electrical installations in large buildings. 
8
A basic installation is made of peripherals like a siren, a power supply, a smoke / fire detector, an alarm button, a light diffuser and so on. 
9
The extent of an installation depends on the customer.
10
To validate an installation, EATON COOPER carries out laboratory tests and estimates the behavior of its peripherals. 
11
It is time consuming and lacks precision.
12
The goal is to accurately simulate on a computer the behavior of the peripherals. 
13
This will have a positive impact both in the commercial context and in the context of Research and Developments.
14
15
16
___________________________________________________________________________________________________________
17
18
_page suivante : [[Remerciements]]_
19
_
20
page précédente : [[Mots Clés et Résume]]_
21
22
___________________________________________________________________________________________________________